{
  "role": "PRJ-007 chart-centered overview and five-stage on-demand details",
  "prepared_on": "2026-10-30",
  "formal_template": "2026-10-28_v1.1.2_weekly-minres",
  "governance": "1.3; limited presentation reuse; not new scientific validation",
  "input_sha256": {
    "锂矿周期研究/04研究工作台/锂产业链研究工作台/临时审核/2026-10-27_PRJ-007库存双版审核/native-r3/assets/styles.css": "3ae422615afcb07346f86394164978805e4ed47ffc7a3281291a87c007fff735",
    "锂矿周期研究/04研究工作台/锂产业链研究工作台/临时审核/2026-10-27_PRJ-007库存双版审核/native-r3/assets/workbench-design.css": "eb45a6bd28492036a9df249cbc2ed386f7080abb9a80cf7df3cf446a5bb08616",
    "锂矿周期研究/00项目管理/01_PRJ_有限期项目/PRJ-007_库存连续性与公司库存压力验证/outputs/lce_inventory_axis_trial_20261028/display_points.json": "c520433317be9a24799d03c22a800799e0fcf5316896f9c6739db53aef7a0614",
    "锂矿周期研究/00项目管理/01_PRJ_有限期项目/PRJ-007_库存连续性与公司库存压力验证/outputs/lce_inventory_axis_trial_20261028/display_gap_connectors.json": "7b337dc69b3ec3e15dea6ac5e7b68f7c0f39192069b487a192b19bbdab8183e1",
    "锂矿周期研究/00项目管理/01_PRJ_有限期项目/PRJ-007_库存连续性与公司库存压力验证/outputs/lce_inventory_axis_trial_20261028/result.json": "6480203e69e9f1c2fa57589a7932ac22632ed0aa4ce19d7eb5af6aba642e722a",
    "锂矿周期研究/00项目管理/01_PRJ_有限期项目/PRJ-007_库存连续性与公司库存压力验证/outputs/lce_inventory_axis_trial_20261028/points.csv": "3ae83367251896d5bf8774ef72363d712226e3ce928b121badf02b1b644027e2",
    "锂矿周期研究/00项目管理/01_PRJ_有限期项目/PRJ-007_库存连续性与公司库存压力验证/outputs/lce_inventory_axis_trial_20261028/inventory_lce_trial.png": "46d0ff391387b435785c5e4e411a3baac65f095cdd1862c3fb09931e57a2d938",
    "锂矿周期研究/04研究工作台/锂产业链研究工作台/临时审核/2026-10-27_PRJ-007库存双版审核/native-r3/data.json": "515abda21520e424b9660c137e6a581d6ff25aa851212c2e72af761e9e5f6609",
    "锂矿周期研究/00项目管理/01_PRJ_有限期项目/PRJ-007_库存连续性与公司库存压力验证/来源核查/资源与原料综合验收记录.md": "3458cf7e0b580312e2411525f7bb54fe55f944694d8941b2e97eb41df9644a7e",
    "锂矿周期研究/00项目管理/01_PRJ_有限期项目/PRJ-007_库存连续性与公司库存压力验证/inputs/inventory_recent_evidence_intake.json": "b58c6c1d02d1a5d461e16141e32e57f6435734f46a36a14938c218850b39ba84",
    "锂矿周期研究/00项目管理/01_PRJ_有限期项目/PRJ-007_库存连续性与公司库存压力验证/来源核查/路线三扩展试算结果记录.md": "a0d1f4cd62921f2a39caac98d5eb21e7b8765043c4ba9afe0c1683f016db50e1",
    "锂矿周期研究/00项目管理/01_PRJ_有限期项目/PRJ-007_库存连续性与公司库存压力验证/来源核查/路线四全链首轮试算结果记录.md": "6511119444905e89985e97f8bdb4c3462c8aea632617ae89e3a6af380dd101cd",
    "锂矿周期研究/00项目管理/01_PRJ_有限期项目/PRJ-007_库存连续性与公司库存压力验证/来源核查/企业库存披露核查记录.md": "b19a4b8034ee83108d672c357a709ed7e3591099a60651d2cba85d34cf2ece94",
    "锂矿周期研究/00项目管理/01_PRJ_有限期项目/PRJ-007_库存连续性与公司库存压力验证/outputs/recent_cross_chain_recalculation_20261022/result.json": "07719c474fa6d5e0cfd6d756d4a35e47c97c4c759ea0158ec2f626c1fe777483",
    "锂矿周期研究/00项目管理/01_PRJ_有限期项目/PRJ-007_库存连续性与公司库存压力验证/inputs/recent_cross_chain_recalculation.json": "952da943ecbe71ddec23390da0f6ce0644b4cd0777158b07720fac74e6f83012",
    "锂矿周期研究/00项目管理/01_PRJ_有限期项目/PRJ-007_库存连续性与公司库存压力验证/全链库存观察与推论研究.md": "600a1ac70e5d60369df94a9e3b6bd7ab9262e5385fb609a4bf225ab60a3ee976",
    "锂矿周期研究/00项目管理/01_PRJ_有限期项目/PRJ-007_库存连续性与公司库存压力验证/来源核查/终端及等待综合验收记录.md": "f646953505d1f1c61a249a2c2ce82983cc2ce194a3de2845fec6e2658a159735",
    "锂矿周期研究/02数据平台与接口/产业链数据框架_v2/raw/inventory/prj007_lce_axis_enrichment_20261028/targeted_refresh_20261029/targeted_review_result.json": "01cf8ae4d3da9f81dd98b440075a39b9524f2563cb1a80c6069e55ed6029f789"
  },
  "current_sha256_before": "c014d4aebcfa91a9947699348a3fa8efa872b6f4e926e350339cf2cc4c7f8a54",
  "scope": "Existing approved chart and frozen evidence; current view states each observation period.",
  "evidence_identity": "Source estimates, engineering conversion, conditional balances and company financials retain distinct identities.",
  "display_updates": "No primary chart point change. Mysteel Oct28 stock is separate from SMM Oct22; raw-ore position split and freshness decisions added.",
  "constraints": [
    "No full-chain sum",
    "No cross-period reconciliation",
    "No CABIA-to-SMM population substitution",
    "Battery September stock unresolved; stop at August",
    "Electrolyte and terminal absent from main chart, not zero"
  ],
  "restore": "r3 and canonical inputs retained; r4 is an isolated new directory. No DB/model/formal release writes.",
  "status": "local review; user acceptance pending",
  "presentation_revision": {
    "date": "2026-10-30",
    "scope": "Material-form names; dated charts; unchanged56-point main series; targeted review adopted as separate supporting evidence",
    "evidence_review_date": "2026-10-29",
    "no_oct30_market_refresh": true
  },
  "prior_revision_current_sha256": "c014d4aebcfa91a9947699348a3fa8efa872b6f4e926e350339cf2cc4c7f8a54",
  "narrative_revision": {
    "date": "2026-10-30",
    "scope": "Existing three-question reading path clarified: location of changes, operating burden, supply-demand implications",
    "comparison": "SMM Oct15–22 and Mysteel Oct21–28 on one shared tonne axis; separate samples and windows",
    "grouping": "SMM downstream display = cathode + cell/other; Mysteel = material/terminal; only approximate holder grouping",
    "constraints": [
      "Totals include components; do not sum twice",
      "No cross-source difference, averaging or splicing",
      "Inventory reduction does not identify consumption versus cautious replenishment"
    ],
    "inputs": "Existing adopted data snapshot; no new market refresh or data mutation",
    "restore": "../qa/native-r4-20261030-narrative-before; prior files retained; no formal release changed"
  },
  "scope_alignment_revision": {
    "date": "2026-10-30",
    "scope": "Conclusion titles; section 01 covers five industrial positions before carbonate detail; section 03 explains effects on production and procurement; aligned company numeric headings and explicit missing Q2 amounts",
    "inputs": "Unchanged adopted snapshot; periods and identities remain separate",
    "restore": "../qa/native-r4-20261030-scope-before"
  },
  "inline_stage_revision": {
    "date": "2026-10-30",
    "scope": "Five stage details now expand under their own overview rows; duplicate bottom stage navigation and jump buttons removed; evidence and four-path content preserved",
    "interaction": "Native details, independent open/close, multiple sections may remain open, refresh restores open sections; legacy stage links resolve locally",
    "restore": "../qa/native-r4-20261030-inline-before"
  },
  "salt_detail_merge": {
    "date": "2026-10-30",
    "scope": "Standalone carbonate comparison moved into salt disclosure before hydroxide, flow and company discussion; duplicated inventory prose and Mysteel source removed; all source rows retained",
    "data": "Unchanged",
    "restore": "../qa/native-r4-20261030-saltmerge-before"
  },
  "evidence_button_pilot": {
    "date": "2026-10-30",
    "scope": "All inventory auxiliary sources, methods, history and audit controls share the accepted muted design with the five-page workbench review",
    "status": "design manual adopted; isolated reviews implemented; no formal release selection",
    "data": "Original source rows, complete labels, periods and caveats retained",
    "canonical_component": "../../2026-10-30_补充资料统一交互/assets",
    "restore": "../../2026-10-30_补充资料统一交互/qa/baseline.json"
  },
  "stage_visual_revision": {
    "date": "2026-10-30",
    "scope": "Resource, material and terminal compact observation tables; battery monthly production-sales difference chart; repeated prose shortened",
    "data": "Existing adopted inputs and component-change figures only; no data refresh",
    "periods": "Each table row keeps its own period and unit; battery chart CABIA Jan-Sep 2026, not physical inventory",
    "status": "isolated review only",
    "restore": "../qa/native-r4-20261030-stage-visuals-before"
  },
  "salt_reading_revision": {
    "date": "2026-10-30",
    "scope": "Single conclusion, chart, one comparability note, meaning and disagreement; classification moved to disclosure; multiweek change retained in historical overview",
    "data": "Unchanged",
    "restore": "../qa/native-r4-20261030-salt-reading-before"
  },
  "page_reading_revision": {
    "date": "2026-10-30",
    "scope": "Trim repeated conclusions and numeric narration across overview, stages, company comparison and supply-demand implications; keep dates and material limits visible; move calculation details to existing sources/methods",
    "data": "Unchanged; existing figures and source rows retained",
    "restore": "../qa/native-r4-20261030-page-reading-before",
    "status": "isolated review; no formal release selection"
  },
  "design_alignment_revision": {
    "date": "2026-10-30",
    "baseline": "2026-10-28_v1.1.2_weekly-minres; handbook v2.5",
    "scope": "1220px body/header alignment; white chart surface; canonical series palette and light tooltips; legible labels; approved supplementary controls retained",
    "unchanged": "Research text, 56 adopted rows, renderer geometry, 1100px chart cap, official release",
    "restore": "../qa/native-r4-20261030-design-alignment-before",
    "validation": "../qa/native-r4-20261030-design-alignment.json"
  }
}
